The planning of the DRS switch-over has been validated.
The intervention will be done in the early morning at 07:00 am (CEST) on May 3rd for 1 hour and a half. and at the same time on May 4th.
The planning of the DRS switch-over has been validated.
The intervention will be done in the early morning at 07:00 am (CEST) on May 3rd for 1 hour and a half. and at the same time on May 4th.
In order to fulfill maintenance for technical operations on our servers, an intervention is planned for 30 March 2022 between 9:30 am to 12:00 am (CET) in the production environment.
We're very excited to launch our PSD2 APIs for AIS and PIS. We have set-up two differenet URLs based on the TPP connectivity either from within UK or outside UK. The following URLs are made available:
The sandbox interfaces: